Haz-Elec Industries was engaged under a Design and Construct contract to deliver a major upgrade of the high and low voltage electrical infrastructure at RAAF Base Scherger. The project involved detailed design, protection coordination, and integration of remote switching and monitoring systems across the base’s power network.
Delivered within an active operational RAAF facility in remote Cape York, the project was completed under challenging weather conditions and logistical constraints typical of the region’s wet season. Haz-Elec’s integrated design, installation and commissioning capability ensured reliable power distribution and improved system resilience for Defence operations at the base.
| Client | Barpa |
| Location | Weipa, QLD, 4874 |
| Delivery model | Design & Construct |
| Project Value | $12.5M |
| Completed | November 2025 |